Phase 1: Supply and installation of internal lining structural desk and Ashzip 400 warm roof system, with rock wool installation and gutters with Supremo membrane and double span structural deck.
Phase 2: Supply and installation of Cadicsh rainscreens and warm roof system, Suprema warm roof (green roof).
Phase 3: Supply and installation of 32000 Euroclad warm roof system with 6 skylights, insulated gutters and terraced area with Suprema tapered system with slabs and stone.
Phase 4: Supply and installation of Euroclad Opus warm cladding system.